Parking Lot Paving
Full installation and repaving for commercial parking areas built on a properly prepared base.
A parking lot is the first thing your customers experience and the last thing most owners want to think about. A well-built lot drains properly, handles years of commercial traffic, and looks professional — a poorly built one fails within a few seasons.
TR Restoration installs and repaves commercial parking lots on a foundation that lasts: proper grading, a compacted base, hot-mix asphalt placed in correct lifts, and code-compliant striping.
Common Problems
- Worn-out lots beyond repair
- Poor drainage and ponding
- Inadequate base causing repeat failures
- Faded or non-compliant striping
What You Get
- Engineered base and grading for proper drainage
- Durable hot-mix surface built for commercial traffic loads
- Clean, professional finish that reflects on your business
- Clear striping and ADA-compliant layout
Our Process
-
Grade & Base
We excavate, grade, and compact a stable aggregate base sized for your traffic loads.
-
Pave
Hot-mix asphalt is laid in proper lifts and compacted for density and longevity.
-
Stripe
We lay out stalls, fire lanes, and ADA spaces to code with durable traffic paint.
Frequently Asked
How long before we can drive on a new lot?
Fresh asphalt is typically ready for traffic within 24 to 72 hours depending on temperature. We will give you a clear timeline for your project.
Get a Free Quote
Tell us about your project and we'll get you a fast, no-obligation estimate.
Request a Quote Call (920) 333-0054